Atuabo, Ghana Gas: CIT planned and supervised a complex lift for SinoPec at their construction site in Atuabo. Senior Engineer Phil Coggin and Godwin Awadzi were tasked with tandem lifting and turning the deethanizer (145t, 35m tall) and debutanizer (45t, 31m tall). The main lift crane was a Kobelco with a 48m boom. Prior to the lift the team inspected every element of lifting equipment including all slings and shackles; they thereafter performed a test lift of 145t. The first actual lift was performed with the 300MT tail crane which placed the first tank. Two days later (having to wait for wind and rain conditions to improve) the second tank was positioned and secured.
“Let me thank you profusely for the magnificent performance by yourself, and indeed Godwin for the lift and place of the vessels at the gas plant. It must be said that CIT operated in “extreme conditions”. The CEO of Ghana Gas, the end user, and visiting ministers were suitably impressed.” Bill Flynn, JMI
-
SUCCESSFUL COMPLETION OF CICB TRAINING F
Recently our CIT Inspectors and Pasico Ghana Engineers underwent intensive training conducted by Jerry Longtin, a seasoned trainer from CICB. (Pasico Ghana is…
-
APPOINTED PERSON TRAINING AT PASICO GHAN
Good and well trained crane operators and riggers are not the only prerequisite to successfully complete safe lifting operations. A…
-
SUCCESSFUL TRAINING FOR A MAJOR MINING G
Our training for a major mining group in West Africa continues. This training is conducted through Pasico’s Certification, Inspection and Training…
-
FORKLIFT TRAINING: US EMBASSY IN ACCRA
We recently carried out Forklift Training for the US Embassy in Accra, in February 2023. The Forklift Training covered practical…
-
TRAINING FOR A MAJOR MINING GROUP IN WES
We recently carried out practical and theory training for a major mining group in West Africa, in early 2023. We…
-
REFRESHER TRAINING FOR CIT DIVISION
To ensure our inspectors and trainers work to the highest standards they must periodically complete refresher training and be…
-
Syama Mine: Mali
Senior Engineer, Phil Coggin, was flown – as the only passenger of a chartered flight - by our customer Resolute…
-
Takoradi Harbour: Ghana
Lift used a 385 MT Crawler Crane. Lift plan and supervision for lifting of two 70MT pump casings from vessel…
-
Ghana Gas: Atuabo
A complex lift for Ghana Gas called a "magnificent performance" by customer, Jon Moore.
-
Newmont Mine: Ghana
Tandem lift using 250 and 170 tonne crawler cranes. Weight of load: 110. Plan and execution to move Liebherr face…
-
Boat Loading: Ghana/Liberia
Boat-side load supervision for two cranes and a forklift truck, Takoradi Ghana.